Dave Hakes' – Island Mode


"I must do something!" will always solve more problems than "Something must be done"

Archive for the 'A/V Business' Category

Ziggy Marley @ The MACC

Posted by delta on 10th December 2007

I actually started out the day dealing with the inside show (Maui Pops Orchestra) and a few other odds and ends. The actual Ziggy show was pretty much self-contained, which is not the norm – usually you’re really running around for these things. Don’t get me wrong, I was running around, but nothing compared to the norm…

Anyway, after Maui Pops ended I went inside to help them strike and get rid of the shell. From that point on, I was dealing with the Ziggy gig (which was good timing cause they showed up at that moment). The doors opened just as I was walking out…

I really don’t have anything to say about the show. Last time I actually was able to pay attention during a Ziggy gig was at the Milwakee Summerfest in 1990 – the crowd was totally different, the band was totally different, and I was totally different – the contrasts between now and then keep me from saying anything other than “Damn, that was loud!”

I had the Db meter in my hand at FOH for three songs – it wasn’t just me being old and crochety, it was loud…

And, “No” I’m not gonna tell you how loud it was…

Posted in A/V Business | No Comments »

Barefoot Natives @ The MACC

Posted by delta on 9th December 2007

This one happened yesterday. Very long day…

I started the day setting up the A&B stage and sound wings for todays show (Ziggy Marley); then I had to setup, run, and strike the preshow audio for the Barefoot Natives; then I had to run upstairs and run spot for the actual show; THEN we struck the stage and setup the orchestra shell for the Maui Pops Orchestra. I actually got booted at 24:00 cause I had to be back here at 08:00 this morning, but after I left the crew also setup a few risers, chairs, and music stands…

Posted in A/V Business | No Comments »

Four Tops @ The MACC

Posted by delta on 7th December 2007

Ran spot for this one last night – they still got it…

There’s only one original guy left in the traveling band, but it was still a fun show. I had fun simply cause I was trying to do the impossible and we somehow managed to get away with it – try covering four guys who are constantly moving with two spots sometime! I’m glad I had Perry up there with me!

Posted in A/V Business | No Comments »

Nutcracker @ The MACC

Posted by delta on 3rd December 2007

I “ran the rail” for this show (from Nov 26th – Dec 2nd). Basically that means that I was the guy pulling the rope to drop the linesets in so we can move all the sets, drops, borders, legs, and lights in place. One guy I gotta give a holler out to is Vance – this is the guy who was up on the grid loading weight for me (my “grid rat”) – awesome job bra’. I’m not sure if everyone reading this understands this show position (I’ve gotten a few emails about it) so I feel I have to explain the process a little:

We like to go in a day or two before the techs from the incoming show get there to preset lights, borders, legs, and any inhouse drops that the show may be using (make sure they’re on the correct lineset) and to clear any batons (linesets) that they will be using (for their drops, or whatever). This makes it quicker, once they get in the house, for the incoming client to get the stuff in and up and start the tech work (focusing lights and what not)…

Basically, I get a house plot and a show plot. The house plot tells me where everything is when I walk in the door on the first day (and Mark keeps this plot totally up to date); the show plot tells me where everything must be for the show. My first responsibility is safety (of the people on deck), second is the gear/house, and third is making sure everything gets where it needs to be as quickly as possible…

The rail is on the deck at the MACC, so I can stay down with the crew as I move the lines. I usually start upstage and work my way downstage line by line – I have to bring the baton in, take off (or put on) what needs to move, have my grid rat weigh it (take bricks off or put bricks on, from the grid – the bricks weigh 27.5 pounds each, and the grid is 75 ft from the deck) to counterweight whatever we are putting on or taking off the baton, test the weight (take the baton about 35 ft in the air and then down another 10-15 ft just to make sure the weight is even), and then take it out…

Depending on the show, this can be a lot of work. Put it this way, on the weeks that I run rail I don’t have to workout…

Anyway, we get this done, the techs from the show come in and we put their stuff in the air the same way. Then, we set up the rest of the show (stage set pieces, marley, audio, video, lighting gel and focus, etc), we rehearse for a day or two, and then we have a day or two of show. Once the show is over, we “strike” the clients stuff first, and then “restore” to the house setup (well, that’s only true half the time – the other half of the time we setup for the next show)…

The funniest part (funny strange) of running the rail (as a show position) is that the bulk of your work is in the setup and strike – the show itself is usually a piece of cake.

Anyway, that is “running the rail”.

Posted in A/V Business | No Comments »

Mo Tita @ The MACC

Posted by delta on 19th November 2007

I ran Cathy Collins Show in the McCoy from the 16th-18th (audio,video, and lighting). She’s a great local comedian/story teller here on the islands – and a great person – so it’s always great to work with her. Of course, she isn’t skimpy on the chocolate as gifts – so, BONUS!

Posted in A/V Business | No Comments »